CSCS practice test 3

Practice test 3: 50 questions from all five areas, as in the real test, where you need 45 correct answers out of 50.

About these questions

These are FreeExamPath's own questions on the topics of the operatives test, written from UK law and HSE guidance. They are not CITB test questions, and FreeExamPath is not affiliated with CITB or CSCS. The CSCS website

Take a timed mock testPractise all questions by area

How the CSCS test works

Your progress is saved only in this browser.

Question 1 · Multiple choice

You wear ear defenders in a noisy area but lift one side off to chat for a few minutes. What is the effect?

Show answer

Correct answer: C — It can greatly reduce the protection you get

Why? HSE advises wearing hearing protection all the time in noisy work and hearing protection areas, because removing it even briefly cuts the protection a lot. Short breaks are not averaged out harmlessly.Source

Report a mistake

Question 2 · Multiple choice

You are working from the basket of a boom-type MEWP and wearing a harness. Where should the short lanyard be attached?

Show answer

Correct answer: C — To the anchor point provided in the basket

Why? In a boom-type MEWP the restraint lanyard should be clipped to the designated anchor point in the basket. Attaching to a nearby structure could pull you out if the basket moves.Source

Report a mistake

Question 3 · Multiple choice

During a strip-out, rubble is being piled up on an upper floor. Why must this be controlled?

Show answer

Correct answer: D — Too much weight could make the floor collapse

Why? CDM 2015 requires that no structure is loaded so as to make it unsafe. Floors in buildings being stripped out may already be weakened.Source

Report a mistake

Question 4 · Multiple choice

Hot cutting is planned near stored cardboard. What control should come before sparks are produced?

Show answer

Correct answer: C — Remove or protect the nearby combustible materials

Why? Hot work must be controlled to prevent sparks igniting combustibles. A watcher does not replace clearing or protecting combustible materials.Source

Report a mistake

Question 5 · Multiple choice

On a project with more than one contractor, who must appoint the principal designer and the principal contractor?

Show answer

Correct answer: C — The client who commissions the work

Why? Under CDM 2015 the client must appoint both dutyholders where more than one contractor will work on the project. HSE enforces the law but does not appoint anyone to these roles.Source

Report a mistake

Question 6 · Multiple choice

Which simple sign suggests that noise at work may be high enough to need action?

Show answer

Correct answer: A — Having to raise your voice to talk at about 2 m

Why? HSE says that needing to raise your voice for a normal conversation at about 2 m apart indicates noise may need action. Being audible off site does not by itself show a risk to hearing.Source

Report a mistake

Question 7 · Multiple choice

A leaning ladder is set up for a short task. What angle does HSE recommend?

Show answer

Correct answer: D — About 75 degrees: one out for every four up

Why? HSE recommends the 1-in-4 rule, which gives an angle of about 75 degrees. A flatter angle risks the foot sliding out; a steeper one risks it falling backwards.Source

Report a mistake

Question 8 · Multiple choice

Before a building is demolished, what should happen to its gas, electricity and water supplies?

Show answer

Correct answer: B — They are disconnected or made safe beforehand

Why? Services must be isolated or disconnected before demolition so workers do not strike live gas or electricity. Gas and water can be as dangerous as electricity.Source

Report a mistake

Question 9 · Multiple choice

You must wear ear defenders and safety glasses together. What should your employer make sure of?

Show answer

Correct answer: D — The items are compatible and both still protect

Why? The PPE at Work Regulations require items worn together to be compatible and still effective. Dropping one item for comfort leaves a hazard uncontrolled.Source

Report a mistake

Question 10 · Multiple choice

A construction project is large enough to be notifiable under CDM 2015. Who has the duty to notify HSE?

Show answer

Correct answer: A — The client for the project

Why? Regulation 6 of CDM 2015 places the notification duty on the client. The principal contractor manages the construction phase, but notifying HSE is not its legal duty.Source

Report a mistake

Question 11 · Multiple choice

Your employer arranges regular hearing checks for workers exposed to high noise. What is their main purpose?

Show answer

Correct answer: D — To detect early hearing damage so action can be taken

Why? Health surveillance for hearing picks up early signs of damage so the employer can act. It does not replace noise controls or allow anyone to stop wearing protection.Source

Report a mistake

Question 12 · Multiple choice

While working on a ladder you need to reach a little further to one side. What should you do?

Show answer

Correct answer: A — Climb down and reposition the ladder

Why? HSE says do not overreach: keep your belt buckle within the stiles and move the ladder instead. Footing the ladder does not stop it tipping sideways when you lean.Source

Report a mistake

Question 13 · Multiple choice

Asbestos lagging has been found in a building due for demolition. When should it normally be removed?

Show answer

Correct answer: C — Before the main demolition work begins on site

Why? The Control of Asbestos Regulations 2012 require asbestos to be removed, so far as reasonably practicable, before major demolition work starts. Knocking it down with the building spreads fibres.Source

Report a mistake

Question 14 · Multiple choice

Since April 2022, which workers do the PPE at Work Regulations protect besides employees?

Show answer

Correct answer: B — Limb (b) workers, such as many casual workers

Why? The 2022 amendment extended employers' PPE duties to limb (b) workers, who often work on a casual basis. The duty does not depend on age or length of service.Source

Report a mistake

Question 15 · Multiple choice

A homeowner hires two building firms for a house extension. Under CDM 2015, who normally carries out the client duties?

Show answer

Correct answer: B — The principal contractor for the project

Why? Domestic clients are covered by CDM 2015, but where more than one contractor is involved their client duties pass to the principal contractor (or to the principal designer by written agreement). Home projects are not exempt.Source

Report a mistake

Question 16 · Multiple choice

You regularly use vibrating tools outdoors in winter. Which step helps keep the blood circulating in your hands?

Show answer

Correct answer: B — Keep your hands warm and dry throughout the day

Why? HSE advises keeping warm and dry to encourage good blood circulation, which helps protect against vibration white finger. A tight grip increases the vibration passed into the hands.Source

Report a mistake

Question 17 · Multiple choice

A ladder is used for access to a scaffold platform. Unless another secure handhold exists, how far should it extend above the landing point?

Show answer

Correct answer: A — At least 1 metre above it

Why? HSE says access ladders should be tied and extend at least 1 m above the landing point to give a secure handhold. A ladder level with the platform leaves nothing to hold when stepping off.Source

Report a mistake

Question 18 · Multiple choice

A new trench will run close to the footings of an existing wall. What must be considered?

Show answer

Correct answer: A — Whether digging could undermine the wall

Why? HSE warns that excavations must not undermine the foundations of nearby buildings or walls. Removing ground near footings can make a structure unstable.Source

Report a mistake

Question 19 · Multiple choice

You are given a type of respirator you have never used before. What should your employer provide?

Show answer

Correct answer: C — Information, instruction and training on its use

Why? Employers must give adequate information, instruction and training so PPE is used correctly. Leaving workers to read the packaging does not meet that duty.Source

Report a mistake

Question 20 · Multiple choice

You must change into special work clothing on site. What must be available for the clothes you are not wearing during working hours?

Show answer

Correct answer: D — A place where they can be locked away

Why? CDM 2015 Schedule 2 requires changing rooms where special clothing is worn and facilities for locking away workers' own clothing. Open hooks or a van do not keep clothing secure.Source

Report a mistake

Question 21 · Multiple choice

Why should blunt or worn tool bits and discs be replaced promptly?

Show answer

Correct answer: C — Worn parts can increase vibration and exposure time

Why? Poorly maintained, blunt tools vibrate more and take longer to do the job, increasing exposure. Maintenance is a key HSE control for hand-arm vibration, not just a matter of finish.Source

Report a mistake

Question 22 · Multiple choice

How should a stepladder normally be positioned for a task?

Show answer

Correct answer: B — Facing the work, to avoid side-on loading

Why? HSE advises positioning a stepladder to face the work and avoiding side loading. Working side-on makes it easier to tip the stepladder over.Source

Report a mistake

Question 23 · Multiple choice

While digging, you damage a pipe and smell gas. What should you do?

Show answer

Correct answer: D — Move away, avoid ignition sources and raise the alarm

Why? A gas leak can ignite, so people must move away, ignition sources must be kept clear and the emergency procedure started. Switching on electrical equipment can create a spark.Source

Report a mistake

Question 24 · Multiple choice

Where should you keep your PPE between uses?

Show answer

Correct answer: A — In the storage provided, kept clean and undamaged

Why? Employers must make sure PPE is properly stored, and workers should use that storage. Loose or exposed storage can damage PPE and stop it protecting you.Source

Report a mistake

Question 25 · Multiple choice

What must washing facilities on a construction site include?

Show answer

Correct answer: C — Hot and cold, or warm, water, soap and drying

Why? Washing facilities must provide clean hot and cold, or warm, water (running where reasonably practicable), soap or similar, and towels or another way of drying. Sanitiser gel does not replace washing facilities.Source

Report a mistake

Question 26 · Multiple choice

Besides vibration white finger, which condition is linked to regular use of hand-held vibrating tools?

Show answer

Correct answer: B — Carpal tunnel syndrome

Why? HSE links hand-arm vibration with both hand-arm vibration syndrome and carpal tunnel syndrome. Asthma and dermatitis are caused by substances, not vibration.Source

Report a mistake

Question 27 · Multiple choice

A scaffold working platform is one from which a person could fall 2 metres or more. How often must it be inspected at minimum?

Show answer

Correct answer: D — At intervals not exceeding 7 days

Why? The Work at Height Regulations 2005 require such platforms to be inspected at least every 7 days, as well as after events likely to affect them. A single check after erection is not enough.Source

Report a mistake

Question 28 · Multiple choice

Demolition is taking place beside a public footpath. How should the public be kept out of the site?

Show answer

Correct answer: C — A secure perimeter, such as hoarding or fencing

Why? CDM 2015 requires steps to prevent unauthorised access to the site, and the 1974 Act protects the public. Signs or tape alone do not keep people out.Source

Report a mistake

Question 29 · Multiple choice

What is the purpose of an emergency stop control on a machine?

Show answer

Correct answer: C — To stop the machine quickly in an emergency situation

Why? PUWER requires emergency stop controls where needed so a machine can be stopped quickly. An emergency stop is not a means of isolation for maintenance.Source

Report a mistake

Question 30 · Multiple choice

Besides seating, what must a site rest area provide?

Show answer

Correct answer: A — Facilities to prepare and eat meals and boil water

Why? Rest facilities must include arrangements for preparing and eating meals and a means of boiling water. Cleaning work tools in a rest area would bring contamination into it.Source

Report a mistake

Question 31 · Multiple choice

A product label shows a pictogram of liquid dripping onto a hand and onto a surface. What does it warn of?

Show answer

Correct answer: A — The substance is corrosive

Why? The corrosion pictogram warns that a substance can burn skin, damage eyes or eat into materials. Flammable substances show a flame symbol instead.Source

Report a mistake

Question 32 · Multiple choice

Before climbing a mobile access tower, what must be checked at its base?

Show answer

Correct answer: C — The castor brakes are locked on at every wheel

Why? Castor brakes must be locked so the tower cannot roll while someone is on it. Stabilisers or outriggers should be fitted as the instructions require, not folded away.Source

Report a mistake

Question 33 · Multiple choice

Why are long-reach machines often used to demolish tall structures?

Show answer

Correct answer: B — They keep workers away from falling material and weak floors

Why? Using machines at a distance keeps people out of the most dangerous areas during demolition. An exclusion zone, a plan and asbestos checks are still needed.Source

Report a mistake

Question 34 · Multiple choice

When may men and women use the same toilet on a construction site?

Show answer

Correct answer: B — When it is in its own room that locks from the inside

Why? Separate rooms for men and women are needed unless each toilet is in a separate room with a door that can be secured from the inside. Site size or duration does not remove this requirement.Source

Report a mistake

Question 35 · Multiple choice

A product label shows a person's outline with a star-shaped mark on the chest. What does this pictogram warn about?

Show answer

Correct answer: D — A serious longer-term health hazard

Why? This health hazard pictogram is used for effects such as cancer or breathing sensitisation. Minor irritants use the exclamation mark pictogram instead.Source

Report a mistake

Question 36 · Multiple choice

You must reach a valve on a roof covered with old cement sheets and roof lights. What applies?

Show answer

Correct answer: D — Treat them as fragile and use platforms or covers

Why? The Work at Height Regulations 2005 require precautions where people could fall through fragile surfaces such as old cement sheets and roof lights. Walking on bolt lines still means standing on the fragile sheets.Source

Report a mistake

Question 37 · Multiple choice

You need to speak to an excavator driver while the machine is working. What should you do?

Show answer

Correct answer: B — Catch the driver's eye and wait for a signal

Why? Approaching working plant without the driver's agreement puts you in blind spots and the machine's path. Wait until the driver has seen you and made the machine safe.Source

Report a mistake

Question 38 · Multiple choice

A small offcut jams the feed of a running machine. What should you do?

Show answer

Correct answer: A — Switch off and make it safe before clearing the jam

Why? Reaching into or near moving parts risks serious injury, so the machine must be stopped and made safe first. Pushing material through still keeps you close to dangerous parts.Source

Report a mistake

Question 39 · Multiple choice

A low beam that people could walk into is marked with tape. Which pattern is a standard marking for this kind of obstacle?

Show answer

Correct answer: D — Alternating yellow and black stripes

Why? The Safety Signs Regulations 1996 mark obstacles and dangerous locations with alternating yellow and black (or red and white) stripes. Green signals a safe condition, not a hazard.Source

Report a mistake

Question 40 · Multiple choice

A water-based cleaner would do the same job as the solvent cleaner your team uses. Under COSHH, what should happen?

Show answer

Correct answer: D — Switch to the less hazardous cleaner if practicable

Why? COSHH puts preventing exposure first, including substituting a less hazardous substance. Relying on gloves or habit leaves the avoidable hazard in place.Source

Report a mistake

Question 41 · Multiple choice

A hole in a floor has been covered with a board. What makes this cover acceptable?

Show answer

Correct answer: B — It is fixed in place and clearly marked

Why? Covers over holes must be secured so they cannot be moved and marked so people know what they are. A cover that blends in invites someone to lift or step on it unknowingly.Source

Report a mistake

Question 42 · Multiple choice

Your team wants to use an excavator to lift and place drainage pipes on a chain. What must be confirmed first?

Show answer

Correct answer: C — It is suitable and set up for lifting under LOLER

Why? An excavator used for lifting is lifting equipment under LOLER and must be suitable, marked and set up for the lift, with the lift properly planned. Digging experience alone is not enough.Source

Report a mistake

Question 43 · Multiple choice

You will work near the rotating spindle of a pillar drill. Which practice reduces the risk of entanglement?

Show answer

Correct answer: B — Keep loose clothing, long hair and jewellery away

Why? Rotating parts can catch loose items and pull a person in. Loose gloves or sleeves can themselves be caught, so they increase rather than reduce the risk.Source

Report a mistake

Question 44 · Multiple choice

Your site uses a siren for emergencies. Under the Safety Signs Regulations 1996, how must an evacuation signal sound?

Show answer

Correct answer: A — Continuous

Why? The Regulations require the sound of an evacuation signal to be continuous so it cannot be mistaken for other signals. Short or repeated blasts are used for other messages on many sites.Source

Report a mistake

Question 45 · Multiple choice

You have been working with a hazardous substance and want a snack. What should you do?

Show answer

Correct answer: B — Wash your hands and eat away from the work area

Why? COSHH controls include not eating, drinking or smoking where substances may contaminate you, and washing first. Gloves or a rag can transfer the substance onto food.Source

Report a mistake

Question 46 · Multiple choice

You need to clear rubble from a scaffold platform to the ground. What is acceptable?

Show answer

Correct answer: A — Lower it in a controlled way, such as a chute

Why? The Work at Height Regulations 2005 forbid throwing or tipping materials from height where this could injure someone. A warning shout does not make throwing safe.Source

Report a mistake

Question 47 · Multiple choice

A dumper's mirrors are caked in mud at the start of a shift. What should happen?

Show answer

Correct answer: D — Clean them and check the view before driving

Why? Visibility aids such as mirrors only work if kept clean and checked before use. Relying on others to shout does not make up for poor visibility.Source

Report a mistake

Question 48 · Multiple choice

Which type of portable power tool carries the lowest risk of electric shock on site?

Show answer

Correct answer: D — Cordless battery-powered tools

Why? Battery-powered tools remove the mains supply altogether, so they are the lowest-risk option. Where mains is needed, reduced-voltage 110 V is preferred over 230 V.Source

Report a mistake

Question 49 · Multiple choice

You discover a small fire starting in a waste skip. What should you do first?

Show answer

Correct answer: C — Raise the alarm at once so that others are warned

Why? Raising the alarm first starts the site emergency procedure and warns others; only tackle a fire if trained and it is safe. Fighting it before telling anyone delays help if the fire grows.Source

Report a mistake

Question 50 · Multiple choice

Which disease can result from breathing respirable crystalline silica dust over time?

Show answer

Correct answer: C — Silicosis

Why? Silica dust from cutting materials such as concrete and stone can cause silicosis, as well as lung cancer and COPD. Mesothelioma and asbestosis are caused by asbestos.Source

Report a mistake

Official sources (2) · last checked 18 October 2026
  • HS&E test for operatives — CITB, checked 18 October 2026
  • CSCS: Construction Skills Certification Scheme — CSCS, checked 18 October 2026